VA West LA
Project Summary
VA West LA MRI:
AMB provided Design and Construction services to replace an existing MRI in the lower level of the VA Medical Center. The Project required an exterior shaft be dug 25 feet from grade down to lower level in order for the MRI to be removed and the new MRI installed.